DUSUP NOC Conditions

The following are DUSUP’s defined NOC Zones:

  • 60 meter either side from the centre of the pipelines or DUSUP Corridor limit, whichever is greater.
  • 10 meter either side of the pipelines located within DEWA or EGA (Dubal) Plot Limits
  • 5 meter either side from the centre of the 8” Shell pipelines (abandoned and positively isolated)
  • 300 meter for High Voltage Overhead Line parallel to hydrocarbon pipelines / pipeline corridors
  • 500 meter from subsea pipelines
  • 500 meter for Land Use Planning adjacent to DUSUP Pipeline / Pipeline Corridor
  • Margham Onshore Plant Safe Zone

No work shall be carried out within the above zones without  an approved written NOC from DUSUP through the E-NOC portal.

DUSUP NOC will include a list of General NOC Conditions that are mandatory for all DUSUP NOCs and Specific NOC conditions that are mandatory to the specific applicant scope of work. The applicant must comply with all General and Specific DUSUP NOC conditions as indicated in the E-NOC Portal, and a copy of the NOC must remain on the worksite throughout the duration of  the work.

No work shall be carried out within 10 meters of a pipeline or related facility without the on-site presence of a Pipeline Representative. The Pipeline Department must be contacted a minimum of four (4) working days in advance of works to arrange for a Pipeline Representative to be in attendance.

Furthermore, contractors are required to provide an undertaking letter for non-disclosure DUSUP confidential and proprietary information. 

DUSUP’s Non-Disclosure Template and Standard NOC Conditions are as follows:

  • DUSUP Non-Disclosure Letter template please click here
  • DUSUP Standard NOC Conditions please click here

For examples of specific NOC conditions for particular works, please refer to  ‘DUSUP NOC GUIDELINES